Find products
Technical informationEnglish
Get in touch

Resources and
environmental impact.

Water, energy and raw materials all go into production. What happens to those resources, and what leaves the site, are part of understanding its environmental impact.

Explore environmental priorities
Illustrated river flowing past a gravel bank and dark slate stones
AI-generated river scene illustrating freshwater as a resource.

Water, materials and energy

These three areas show where resources are used and what to look for when assessing changes over time.

At our production sites

SUNSON has production sites in Yinchuan and Cangzhou. Water use, energy use and waste need to be assessed for each site and reporting period.

Discharge permit for Cangzhou

Site covered
Cangzhou
Valid through

The permit identifies the site and the activities it covers. Measured discharge volumes belong in the site’s monitoring records.

AI-generated illustrative scene

Environmental actions on site

Water management

Water intake and wastewater discharge describe different parts of the same process. Recording both helps explain how water moves through the site.

Pending · Confirmed site practices and water monitoring records.

Materials and waste

Waste records can distinguish materials recovered for further use from waste sent for treatment or disposal.

Pending · Confirmed handling practices and waste records.

Comparing resource use over time

Water and energy use can rise or fall as production volumes change. Comparing both the total and the amount used per unit of output helps put that change in context.

Reporting scope
Specify the site, activities and dates covered by the figures.
Measurement methods
Use the same methods and units across reporting periods.
Source records
Check reported figures against the original records, such as meter readings and waste logs.

What the annual records will cover

Water, energy and waste

Annual figures by production site and reporting period.